| New Projects |
| New Development European Central Bank, Frankfurt |

| Project: New Development European Central Bank,Frankfurt Package cladding area - batch 2 and 3 Owner and Client: Europäische Zentralbank, Frankfurt am Main Architect: COOP HIMMELB(L)AU, Wien Site Management Façade: Gassmann + Grossmann Baumanagement GmbH, Stuttgart und Frankfurt Façaden Area: Batch 2: approx. 11.150 m2, Atrium - Steel façade Batch 3: approx. 18.750 m2, Internal skin - Aluminium façade |
Scope of Work: Batch 2: external skin and roof atrium high-rise Steel construction with attached unitised aluminium façade, partly with openable leaves. Steel-roof construction with attached mullion-transom-façade. Batch 3: Internal skin high-rise Aluminium panel construction for internal skin of the office towers. Sun shading and blinds for internal skin. Light metal sheeting for closed areas of the staircases. Installation Period: Batch 2: March 2012/Batch 3: March 2011 - Batch 2 and 3: September 2012 |
| Ap Lei Chau 129 Podium Façade, Ap Lei Chau, Hong Kong |

| Owner/End User: Arge von Sun Hung Kai Properties Ltd., Hong Kong Kerry Properties Ltd., Hong Kong & Paliburg Holdings Ltd., Hong Kong Architect: Ronald Lu & Partners (HK) Ltd., Hong Kong Main Contractor: Chun Fai Construction Co. Ltd., Hong Kong Façade Area: 13.489 m2 |
Scope Of Work: Supply and Installation of: 3,376 m2 Windows and Doors 6,632 m2 Cladding & Features 1,247 m2 Feature Glass Wall 220 m2 Covered Walkway & Canopy 1,230 m2 Grilles 208 m2 Louvres, FR Windows & FR Doors, Skylight etc. Installation Period: March 2010 - September 2010 |
| 53 Stubbs Road, Hong Kong |

| Project: 53 Stubbs Road, Hong Kong Owner: Swire Pacific Ltd., Hong Kong Architect: Gehry Partners, LLP, Los Angeles Ronald Lu & Partners (HK) Ltd., Hong Kong Façade Consultant: Emmer Pfenninger Partner AG, Basel, Schweiz Solstice Consulting Ltd., Hong Kong Main Contractor: Gammon Construction Ltd., Hong Kong |
Façade Area: 6.882 m2 Scope Of Work: Windows, Sliding Doors (partly curved), Doors, Shingle Wall, Glass Wall, Skylight, Canopy, Balustrade, Aluminium Cladding, Glass Column Cladding Installation Period: October 2010 - June 2011 |
| Monmouth Path Footbridge, Hong Kong |

| Project: Monmouth Path Footbridge, Wan Chai (Hong Kong) Client / User: Swire Properties Ltd., Hong Kong Architect: Wong & Ouyang (HK) Ltd., Hong Kong Façade Consultant: Meinhardt Façade Technology (HK) Ltd., Hong Kong Main Contractor: Hanison Construction Company Limited, Hong Kong |
Façade Area: 800 m2 Scope Of Work: Supply and installation of the Covered Pedestrian Footbridge with filigree glass wall, stainless steel castings, dot fixings and glass wall fixings connecting to existing Gartner Cable-net Glass Wall of Three Pacific Place. Installtion Period: March - July 2010 |
| Business House Thurgauer Straße 38, Zurich |
| Project: Business House Thurgauer Straße 36/38, Zurich Owner: AXA Investment Managers Schweiz AG, Zurich Architect: Arbeitsgemeinschaft atelier ww / Max Dudler, Zurich Façade Consultant: Stäger + Nägeli AG, Zurich |
Main Contractor: Implenia Generalunternehmung AG, Dietlikon Façade Area: 8.600 m2 Scope Of Work: Air flow façade, with storey-high tilt windows and with two inner maintenance and cleaning leaves. Installation Period: August 2010 - May 2011 |
|

| Owner: The Government of Hong Kong Special Administrative Region Client and Management Contractor: Gammon Construction Limited, Hong Kong Architect: Wong & Ouyang (HK) Ltd, Hong Kong Façade Consultant: Shanghai Sunshine Architectural Technology Co Ltd, Shanghai Façade Area: 3,000 m2 (including outer and inner skin) |
Scope Of Work: Glass Wall - Full height glass wall at L1 and L2 level; Full height mirror glass wall at RF Metal Cladding - Aluminium perforated cladding surrounding L1 and RF as the outer skin of the façade; Aluminium extruded cladding covering up the RC core at L2 Canopies - Entrance Canopy and Exit Canopy clad with Aluminium Panel; Roof glass canopy with fritted pattern glass on top Installation Period: August 2009 - November 2009 |
| The Cleveland Museum of Art, Cleveland, Ohio |

| Project: The Cleveland Museum of Art, Cleveland, Ohio Client: The Cleveland Museum of Art, Cleveland, Ohio The Rise Group, LLC, Chicago, Illinois Architect: Rafael Vinoly Architects PC, New York, New York |
Main Contractor: Panzica / Gilbane, Cleveland, Ohio Façade Area: 4.000 m2 Scope Of Work: Manufacture, delivery and installation of a glazed roof as Integrierted Façade System Gartner®, and of the East, West and South façades of the atrium |
| ABR - Bau 5 Administrationsgebäude |

| Project: ABR - Bau 5 Administrationsgebäude Owner and Client: Roche Diagnostics Ltd, CH-Rotkreuz Representation of the owner and Project Management: projektrosenberg, CH-8044 Zürich Architect: Burckhardt + Partner AG Architekten Generalplaner, Basel Planning: PPEngineering, Basel |
Site Management: Demmel Bauleitungen + Beratung, Baubüro USZ, Zürich Façade Area: 8.200 m2 Scope Of Work: Closed Cavity Façade CCF (Double Skin) with supply of dry air Installation Period: February 2010 - October 2010 |
| Neubau ADAC Zentrale, München |

| Project: New Building ADAC-Zentrale, München Owner: ADAC e.V., München Client: Arge Neubau ADAC Zentrale, München Architect: Sauerbruch Hutton, Berlin |
Façade Area: 21.000 m2 Scope Of Work: 11.000 m2 double skin façade, 9.000 m2 ribbon window construction, 2.350 m2 steel roofing, 1.000 m2 steel walling, 6 steel roof lights Installation Period: September 2009 - February 2011 |
| Tamar Development Project, Hong Kong |

| Project: Tamar Development Project, Hong Kong Owner: Government of Hong Kong Special Administrative Region, Hong Kong Employer Representative: Architectural Services Department, Hong Kong Main Contractor: Gammon - Hip Hing Joint Venture, Hong Kong Architect: Rocco Design Architects Ltd., Hong Kong Design Checker: ALT Cladding Consultant, Hong Kong Façade Area: 103.850 m2 |
Scope Of Work: Central Government Complex Office Block Unitized tower curtain wall; aluminium cladding; louvers; steel glass wall; stone cladding; canopies with caldding; of skylights and balustrades Central Government Complex Low Block Unitized curtain wall; aluminium cladding; aluminium soffit panels; glass wall with vertical glass fins and spider fixing, stone cladding; canopy with glass and aluminium cladding Legislative Council Complex Unitized tower curtain wall; unitized curtain wall; glass wall; aluminium cladding; continuous vertical louvers; continuous vertical louvers; aluminium soffit panels; canopy with glass and aluminium cladding; skylights Installation Period: Dezember 2009 - Dezember 2010 |
| Daniel Swarovski Corporation (DSC) Männedorf |

| Project: Daniel Swarovski Corporation (DSC) Männedorf, Schweiz Client and Main Contractor Implenia Generalunternehmung AG, Dietlikon Owner: Swarovski Immobilien AG, Feldmeilen Architect and Main Planning: Ingenhoven Architects International, Männedorf |
Executive Architect: Dachtler Partner AG Architekten, Zürich Façade Area: 4.800 m2 Scope Of Work: Vorhangfassaden mit äußeren Lüftungsflügeln Installation Period: July 2009 - February 2010 |
| German Stock Exchange, Eschborn |

| Project: Neubau Bürogebäude Mergenthalerallee 61-71, Deutsche Börse, Eschborn Client and Owner: Lang & Gross Management GmbH & Co. KG, Eschborn Architect: KSP Engel und Zimmermann, Frankfurt Site Management Façade: AMP Ingenieurbüro für Fassadentechnik für angewandte Bauphysik Albrecht Memmert, Neuss |
Façade Area: 40.000 m2 Scope Of Work: Kastenfenster, Kaltfassade, Integrierte Fassade System Gartner®, Blechfassaden, Dachkonstruktion Installation Period: May 2009 - April 2010 |
| Isabella Stewart Gardner Museum, Boston |

| Project / Owner: Isabella Stewart Gardner Museum, Boston Owner´s Representative: Paratus Group, New York Construction Manager: Shawmut Design and Construction, Boston Architects: Renzo Piano Building Workshop, Genova, Italy Burt, Hill, Boston |
Façade Area: 5.400 m2 Scope Of Work: Stahl-Pfosten-Riegel-Fassade und Kaltfassade (Kupferbleche) Installation Period: March 2010 - March 2011 |
| Deutsche Bank, Frankfurt Revitalization |

| Project: Deutsche Bank, Frankfurt Owner: Deutsche Bank AG, Corporate Real Estate & Services (CRES) Project Blue, Frankfurt am Main Architects: Gmp, Frankfurt am Main Architekturbüro Bellini, Mailand Façade Consultant: Emmer Pfenninger Partner AG, Münchenstein, Schweiz DS-Plan AG, Advanced Building Technologies, Stuttgart IFFT Institut für Fassadentechnik, Frankfurt am Main Façade Area: 53.000 m2 |
Scope Of Work: Refurbishment with highest energetic and ecological aspects whilst maintaining the original aesthetics. Highrise buidlings: Replacement of the existing façade incl. disposal; planning, fabrication and installation of the new façade construction, operable as parallel-ventwindow (pop out) in every other module. Podium: Replacement of the existing façade incl. disposal; planning, fabrication and installation of the new façade construction maintaining the existing appearance. Installation Period: October 2008 - March 2010 |
| One Central, Macau |

| Project: Externe Podiumsfassade für The Mixed Use Development at Lot B, Zone B, Nape, Macau Client: Propriedades Sub F, S.A., Macau Architect: Wong & Tung International Ltd., Hong Kong Submission Architect: Eddie Wong & Associates Ltd., Macau Design Architect: Kohn Pedersen Fox Associates PC., New York, USA Façade Consultant: ALT Cladding & Design Philippines, Inc., Manila, Philippines Engineer: Siu Yin Wai & Associates (Intl) Ltd., Hong Kong |
Management Contractor: Hip Hing Engineering (Macau) Co. Ltd, Macau Subcontractor Façade: Josef Gartner (Macau) Ltd, Macau (Subsidiary of Josef Gartner & Co. (HK) Ltd.) Façaden Area: 4,000 m2 Façade with Skylight/Atrium 300 m Glass Balustrades 450 m2 Aluminium Ceiling 450 m2 Hotel Store Front 3 Nos. Glazed and Aluminium Canopy Scope Of Work: Design, supply and installation of Podium Facade (with structural steel / glass fin support & low iron frit glass), Skylight, Glass parapet, Aluminium Ceiling and Glazed / Aluminium Canopy Installation Period: December 2007- July 2008 |
| Chiswick Park London, Building 8 |

| Project: Chiswick Park Building 8, London Owner: Stanhope PLC, London Architect: Rogers Stirk Harbour + Partner, London Façade Consultant: Arup Façade Engineering, London Site Management: Bovis Lend Lease Ltd, London |
Façade Area: Building 8 - 4.800 m2 Building 9 - 5.200 m2 Scope Of Work: |
| ELBPHILHARMONIE Hamburg |
© Herzog & de Meuron
| Project: ELBPHILHARMONIE, Hamburg Owner: Elbphilharmonie Hamburg Bau GmbH & Co. KG represented by ReGe Hamburg, Projekt-Realisierungsgesellschaft mbH Architect/Planer: Herzog & de Meuron, Hamburg Höhler + Partner, Hamburg Façade Consultant: R + R Fuchs, Ingenieurbüro für Fassadentechnik, Munich |
Main Contractor and Client: Hochtief Hamburg Façade Area: 22.000 m2 Scope Of Work: Façade with spherically curved double glazed units; Loggia façade as Unitized Curtain Wall System Plaza façade |
| One New Change, London |

| Project: One New Change, London Owner: Land Securities, Group PLC, London Design Architect: Jean Nouvel, Paris Executive Architect: Sidell Gibson, London Main Contractor: Bovis Lend Lease, Harrow, Middlesex |
Façade Area: 31,275 m2 Scope Of Work: Different Unitized Curtain Wall System among other things Double-Skin-Façade; complex geometry of the building and elaborate pattern glass Installation Period: June 2009 - August 2010 |