New Projects


New Development European Central Bank, Frankfurt



Project:
New Development European Central Bank,Frankfurt
Package cladding area - batch 2 and 3

Owner and Client:
Europäische Zentralbank, Frankfurt am Main

Architect:
COOP HIMMELB(L)AU, Wien

Site Management Façade:
Gassmann + Grossmann Baumanagement GmbH, Stuttgart und Frankfurt

Façaden Area:
Batch 2: approx. 11.150 m2, Atrium - Steel façade
Batch 3: approx. 18.750 m2, Internal skin - Aluminium façade

Scope of Work:
Batch 2: external skin and roof atrium high-rise
Steel construction with attached unitised aluminium façade, partly with openable leaves. Steel-roof construction with attached mullion-transom-façade.

Batch 3: Internal skin high-rise
Aluminium panel construction for internal skin of the office towers. Sun shading and blinds for internal skin. Light metal sheeting for closed areas of the staircases.

Installation Period:
Batch 2: March 2012/Batch 3: March 2011 - Batch 2 and 3: September 2012

Ap Lei Chau 129 Podium Façade, Ap Lei Chau, Hong Kong


Owner/End User:
Arge von Sun Hung Kai Properties Ltd., Hong Kong
Kerry Properties Ltd., Hong Kong & Paliburg Holdings Ltd., Hong Kong

Architect:
Ronald Lu & Partners (HK) Ltd., Hong Kong

Main Contractor:
Chun Fai Construction Co. Ltd., Hong Kong

Façade Area:
13.489 m2
Scope Of Work:
Supply and Installation of:
3,376 m2 Windows and Doors
6,632 m2 Cladding & Features
1,247 m2 Feature Glass Wall
220 m2 Covered Walkway & Canopy
1,230 m2 Grilles
208 m2 Louvres, FR Windows & FR Doors, Skylight etc.

Installation Period:
March 2010 - September 2010


53 Stubbs Road, Hong Kong


Project:
53 Stubbs Road, Hong Kong

Owner:
Swire Pacific Ltd., Hong Kong

Architect:
Gehry Partners, LLP, Los Angeles
Ronald Lu & Partners (HK) Ltd., Hong Kong

Façade Consultant:
Emmer Pfenninger Partner AG, Basel, Schweiz
Solstice Consulting Ltd., Hong Kong

Main Contractor:
Gammon Construction Ltd., Hong Kong

Façade Area:
6.882 m2

Scope Of Work:
Windows, Sliding Doors (partly curved), Doors, Shingle Wall, Glass Wall, Skylight, Canopy, Balustrade, Aluminium Cladding, Glass Column Cladding

Installation Period:
October 2010 - June 2011


Monmouth Path Footbridge, Hong Kong


Project:
Monmouth Path Footbridge, Wan Chai (Hong Kong)

Client / User:
Swire Properties Ltd., Hong Kong

Architect:
Wong & Ouyang (HK) Ltd., Hong Kong

Façade Consultant:
Meinhardt Façade Technology (HK) Ltd., Hong Kong

Main Contractor:
Hanison Construction Company Limited, Hong Kong

Façade Area:
800 m2

Scope Of Work:
Supply and installation of the Covered Pedestrian Footbridge with filigree glass wall, stainless steel castings, dot fixings and glass wall fixings connecting to existing Gartner Cable-net Glass Wall of Three Pacific Place.

Installtion Period:
March - July 2010



Business House Thurgauer Straße 38, Zurich


Project:
Business House Thurgauer Straße 36/38, Zurich

Owner:
AXA Investment Managers Schweiz AG, Zurich

Architect:
Arbeitsgemeinschaft atelier ww / Max Dudler, Zurich

Façade Consultant:
Stäger + Nägeli AG, Zurich
Main Contractor:
Implenia Generalunternehmung AG, Dietlikon

Façade Area:
8.600 m2

Scope Of Work:
Air flow façade, with storey-high tilt windows and with two inner maintenance and cleaning leaves.

Installation Period:
August 2010 - May 2011


The Hong Kong Pavilion For HKSAR´s Participation in the World Esposition 2010 Shanghai, China


Owner:
The Government of Hong Kong Special
Administrative Region

Client and Management Contractor:
Gammon Construction Limited, Hong Kong

Architect:
Wong & Ouyang (HK) Ltd, Hong Kong

Façade Consultant:
Shanghai Sunshine Architectural Technology
Co Ltd, Shanghai

Façade Area:
3,000 m2 (including outer and inner skin)
Scope Of Work:
Glass Wall - Full height glass wall at L1 and L2 level;
Full height mirror glass wall at RF

Metal Cladding - Aluminium perforated cladding surrounding L1 and RF as the outer skin of the façade;
Aluminium extruded cladding covering up the RC core at L2

Canopies - Entrance Canopy and Exit Canopy clad with Aluminium Panel; Roof glass canopy with fritted pattern glass on top

Installation Period:
August 2009 - November 2009


The Cleveland Museum of Art, Cleveland, Ohio


Project:
The Cleveland Museum of Art, Cleveland, Ohio

Client:
The Cleveland Museum of Art, Cleveland, Ohio
The Rise Group, LLC, Chicago, Illinois

Architect:
Rafael Vinoly Architects PC, New York, New York


Main Contractor:
Panzica / Gilbane, Cleveland, Ohio

Façade Area:
4.000 m2

Scope Of Work:
Manufacture, delivery and installation of a glazed roof as Integrierted Façade System Gartner®, and of the East, West and South façades of the atrium


ABR - Bau 5 Administrationsgebäude


Project:
ABR - Bau 5 Administrationsgebäude

Owner and Client:
Roche Diagnostics Ltd, CH-Rotkreuz

Representation of the owner and
Project Management:
projektrosenberg, CH-8044 Zürich

Architect:
Burckhardt + Partner AG Architekten Generalplaner, Basel

Planning:
PPEngineering, Basel
Site Management:
Demmel Bauleitungen + Beratung, Baubüro USZ, Zürich

Façade Area:
8.200 m2

Scope Of Work:
Closed Cavity Façade
CCF (Double Skin) with supply of dry air

Installation Period:
February 2010 - October 2010



Neubau ADAC Zentrale, München


Project:
New Building ADAC-Zentrale, München

Owner:
ADAC e.V., München

Client:
Arge Neubau ADAC Zentrale, München

Architect:
Sauerbruch Hutton, Berlin
Façade Area:
21.000 m2

Scope Of Work:
11.000 m2 double skin façade, 9.000 m2 ribbon
window construction, 2.350 m2 steel roofing,
1.000 m2 steel walling, 6 steel roof lights

Installation Period:
September 2009 - February 2011


Tamar Development Project, Hong Kong



Project:
Tamar Development Project, Hong Kong


Owner:
Government of Hong Kong Special Administrative Region, Hong Kong

Employer Representative:
Architectural Services Department, Hong Kong

Main Contractor:
Gammon - Hip Hing Joint Venture, Hong Kong

Architect:
Rocco Design Architects Ltd., Hong Kong

Design Checker:
ALT Cladding Consultant, Hong Kong

Façade Area:
103.850 m2

Scope Of Work:
Central Government Complex Office Block
Unitized tower curtain wall; aluminium cladding;
louvers; steel glass wall; stone cladding; canopies with caldding; of skylights and balustrades

Central Government Complex Low Block
Unitized curtain wall; aluminium cladding; aluminium soffit panels; glass wall with vertical glass fins and spider fixing, stone cladding; canopy with glass and aluminium cladding

Legislative Council Complex
Unitized tower curtain wall; unitized curtain wall; glass wall; aluminium cladding; continuous vertical louvers; continuous vertical louvers; aluminium soffit panels; canopy with glass and aluminium cladding; skylights

Installation Period:
Dezember 2009 - Dezember 2010


Daniel Swarovski Corporation (DSC) Männedorf



Project:
Daniel Swarovski Corporation (DSC) Männedorf,
Schweiz

Client and Main Contractor
Implenia Generalunternehmung AG, Dietlikon

Owner:
Swarovski Immobilien AG, Feldmeilen

Architect and Main Planning:
Ingenhoven Architects International, Männedorf
Executive Architect:
Dachtler Partner AG Architekten, Zürich

Façade Area:
4.800 m2

Scope Of Work:
Vorhangfassaden mit äußeren Lüftungsflügeln

Installation Period:
July 2009 - February 2010


German Stock Exchange, Eschborn


Project:
Neubau Bürogebäude Mergenthalerallee 61-71,
Deutsche Börse, Eschborn

Client and Owner:
Lang & Gross Management GmbH & Co. KG, Eschborn

Architect:
KSP Engel und Zimmermann, Frankfurt

Site Management Façade:
AMP Ingenieurbüro für Fassadentechnik für angewandte Bauphysik Albrecht Memmert, Neuss
Façade Area:
40.000 m2

Scope Of Work:
Kastenfenster, Kaltfassade, Integrierte Fassade System Gartner®, Blechfassaden, Dachkonstruktion

Installation Period:
May 2009 - April 2010


Isabella Stewart Gardner Museum, Boston

Project / Owner:
Isabella Stewart Gardner Museum, Boston

Owner´s Representative:
Paratus Group, New York

Construction Manager:
Shawmut Design and Construction, Boston

Architects:
Renzo Piano Building Workshop, Genova, Italy
Burt, Hill, Boston

Façade Area:
5.400 m2

Scope Of Work:
Stahl-Pfosten-Riegel-Fassade und Kaltfassade (Kupferbleche)

Installation Period:
March 2010 - March 2011

Deutsche Bank, Frankfurt
Revitalization



Project:
Deutsche Bank, Frankfurt

Owner:

Deutsche Bank AG, Corporate Real Estate & Services (CRES) Project Blue”, Frankfurt am Main

Architects:
Gmp, Frankfurt am Main
Architekturbüro Bellini, Mailand

Façade Consultant:
Emmer Pfenninger Partner AG, Münchenstein, Schweiz
DS-Plan AG, Advanced Building Technologies, Stuttgart
IFFT Institut für Fassadentechnik, Frankfurt am Main

Façade Area:
53.000 m2
Scope Of Work:
Refurbishment with highest energetic and ecological aspects whilst maintaining the original aesthetics.
Highrise buidlings: Replacement of the existing façade incl. disposal; planning, fabrication and installation of the new façade construction, operable as parallel-ventwindow (pop out) in every other module.
Podium: Replacement of the existing façade incl.
disposal; planning, fabrication and installation of the new façade construction maintaining the existing appearance.

Installation Period:
October 2008 - March 2010


One Central, Macau



Project:
Externe Podiumsfassade für The Mixed Use Development at Lot B, Zone B, Nape, Macau

Client:
Propriedades Sub F, S.A., Macau

Architect:
Wong & Tung International Ltd., Hong Kong

Submission Architect:
Eddie Wong & Associates Ltd., Macau

Design Architect:
Kohn Pedersen Fox Associates PC., New York, USA

Façade Consultant:
ALT Cladding & Design Philippines, Inc., Manila, Philippines

Engineer:
Siu Yin Wai & Associates (Int’l) Ltd., Hong Kong
Management Contractor:
Hip Hing Engineering (Macau) Co. Ltd, Macau

Subcontractor Façade:
Josef Gartner (Macau) Ltd, Macau (Subsidiary of Josef Gartner & Co. (HK) Ltd.)

Façaden Area:
4,000 m2 Façade with Skylight/Atrium
300 m Glass Balustrades
450 m2 Aluminium Ceiling
450 m2 Hotel Store Front
3 Nos. Glazed and Aluminium Canopy

Scope Of Work:
Design, supply and installation of Podium Facade (with structural steel / glass fin support & low iron frit glass), Skylight, Glass parapet, Aluminium Ceiling and Glazed / Aluminium Canopy

Installation Period:
December 2007- July 2008


Chiswick Park London, Building 8



Project:
Chiswick Park Building 8, London

Owner:
Stanhope PLC, London

Architect:
Rogers Stirk Harbour + Partner, London

Façade Consultant:
Arup Façade Engineering, London

Site Management:
Bovis Lend Lease Ltd, London
Façade Area:
Building 8 - 4.800 m2
Building 9 - 5.200 m2

Scope Of Work:
Element façades standard panel 3.0 m x 3.95 m
Main Entrance with planar glazing.

Installation Period:

November 2007 - June 2008



ELBPHILHARMONIE Hamburg


© Herzog & de Meuron

Project:
ELBPHILHARMONIE, Hamburg

Owner:
Elbphilharmonie Hamburg Bau GmbH & Co. KG represented by ReGe Hamburg, Projekt-Realisierungsgesellschaft mbH

Architect/Planer:
Herzog & de Meuron, Hamburg
Höhler + Partner, Hamburg

Façade Consultant:
R + R Fuchs, Ingenieurbüro für Fassadentechnik, Munich
Main Contractor and Client:
Hochtief Hamburg

Façade Area:
22.000 m2

Scope Of Work:
Façade with spherically curved double glazed units; Loggia façade as Unitized Curtain Wall System Plaza façade


One New Change, London


Project:
One New Change, London

Owner:
Land Securities, Group PLC, London

Design Architect:
Jean Nouvel, Paris

Executive Architect:
Sidell Gibson, London

Main Contractor
:
Bovis Lend Lease, Harrow, Middlesex
Façade Area:
31,275 m2

Scope Of Work:
Different Unitized Curtain Wall System among other things Double-Skin-Façade; complex geometry of the building and elaborate pattern glass

Installation Period:
June 2009 - August 2010